Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 8012653
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: June 4, 20262026-06-04T19:23:23+00:00 2026-06-04T19:23:23+00:00

Assume I have a build with three projects: A, B and C. If I

  • 0

Assume I have a build with three projects: A, B and C. If I am currently in the context of A and reload the build, it might change the context to be C after the reload. Because of this, I have to change my project context every time after reloading.

Is there a way to set a specific project as the default context?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-06-04T19:23:25+00:00Added an answer on June 4, 2026 at 7:23 pm

    SBT chooses the first lexographical project variable name, so I just set my project name to:

    val aaaFrontend = PlayProject(
    

    Also, there’s a projects Seq that I believe you can override.

    Finally, in SBT 0.12 you can do it in you .sbtrc:

    alias boot = ;reload ;project X ;iflast shell
    
    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

Assume I have three build configurations Build and Run Tests QA Build Production Build
I have a flex library project, assume this project as basic utility which will
I have a personal project that I'd like to build as an add-in for
I maintain the build system at my company, which is currently using CVS. This
I have a workspace containing 2 projects: A project that has 2 products: a
Let's assume I have a C# Winforms project, MainGUI. It references another project in
Assume you want to build a database for some web application. This database already
Assume I have two tables, Student Test Id Name TestId Type StudentId -- ----
Assume I have an enumerable object enum and now I want to get the
Assume I have the following ; def test(): while 1: a = b time.sleep(60)

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.