Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 950099
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 15, 20262026-05-15T23:30:42+00:00 2026-05-15T23:30:42+00:00

Assuming the global development effort is known (from a preliminary work structure breakdown), what

  • 0

Assuming the global development effort is known (from a preliminary work structure breakdown), what percentage of that effort should I add in order to allocate enough manpower for requirement definition and refinement?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-15T23:30:43+00:00Added an answer on May 15, 2026 at 11:30 pm

    Requirement definition should be just that. In my experience people tend to envision the future solution already and start to put design assumptions into the requirement specifications. This unnecessarily prolongs the phase with lots of workshops and discussions. If you keep it strict to pure functional and non-functional requirement gathering (not design) I would put no more than 10%-15% of the time into it and no more than 10% of manpower effort. In your situation it seems like there are certain design descission already made and agreed to. However I would still see 10-15% because having the requirements formally put down and signed off are of good value in the project being referred back to all along the way. I once took over a project where all the personal for later phases was already recruited and burned down costs so I had to live with it. In that case I had to assume more effort (but not time) for that phase because I just did not want to skip it or skimp the phase and had the high burn rate as a fact. In project management sometimes external conditions ask for alot of flexibility and seldom all is perfect. It is also not seldom that you get assigned a certain budget as a share from a global budget and have to live with it. Often the milestones are also set. Like “do it in one year”. So time is 10-15%. Effort should be less.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

Assuming that the mysqli object is already instantiatied (and connected) with the global variable
Assuming that I have this: enum { A = 0x2E, B = 0x23, C
Assuming I have a ASP.NET MVC 3 application that runs in a web farm
Assuming that parsing the equation would not be a problem, how can I make
Assuming that the larger a database gets, the longer it will take to SELECT
Please note that this is just a thought experiment. I know global (static) vars
assuming that i'm writing a wordpress plugin. now i want its includes and include
Assuming i have this classic switch , i know that when we are building
Am I right assuming that session variables are available on the same page even
I do understand that functions should not return references to automatic variables. However I

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.