Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 4335616
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 21, 20262026-05-21T10:41:40+00:00 2026-05-21T10:41:40+00:00

Currently I have an SSIS job that runs to move data from one sql

  • 0

Currently I have an SSIS job that runs to move data from one sql 20008 machine to another. The job moves about 2 million records from about 6 tables. That takes about 5-10 minutes depending on the server load and that is fine. Because the data is moved into temp tables so nothing is affected besides the strain on the server.

But my problem becomes when I now want to merge that data with their respective live tables. That can take about 15 minutes during which the tables are emptied and then repopulated. What I am wondering is what is the most efficient way to move that data between the tables.

Currently here is how it goes:

drop tables
rebuild tables with indexes and constraints
insert into select to move the data
then run any calculations that are needed
run following command to rebuild all the indexes after the data has been moved:

sp_MSforeachtable @command1="print '?' DBCC DBREINDEX ('?')"

I feel like there should be a better way so that there is minimal down time to the users. One thought I had was to create a second set of tables and then just rename those once they are ready but I am not sure if that is the best way either.

I have also just read about the merge command which might be better as I don’t have to drop the tables and repopulate which means all the data would stay available but it is hard to know if the records change without looking at nearly all the columns.

I would appreciate any help.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-21T10:41:41+00:00Added an answer on May 21, 2026 at 10:41 am

    After considering the option for the view with different underlying tables I decided against to avoid the complexity and confusion that it might introduce. I looked into partitioning but since I do not have much control on the source machine it didn’t seem like the appropriate solution. So in the end I just decided to use the SQL MERGE statement and use BINARY_CHECKSUM to compare rows and determine differences or not. Thhough I am not having some issues with the locking with that. But I have opened another question for that.

    How to improve performance of SQL MERGE statement

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I currently have a DetailsView in ASP.NET that gets data from the database based
Here's my scenario - I have an SSIS job that depends on another prior
I am currently creating dynamic SSIS packages that import/export and access data between a
I currently have an MS Access application that connects to a PostgreSQL database via
I have a friend who works at a job that has no planned upgrade
We have a very large number of SSIS jobs that are scheduled every evening/early
We currently have a solution developed using SSIS / C#. The SSIS package (amongst
I currently have speakers set up both in my office and in my living
I currently have an existing database and I am using the LINQtoSQL generator tool
We currently have a company email server with Exchange, and a bulk email processing

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.