Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 608289
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 13, 20262026-05-13T17:26:49+00:00 2026-05-13T17:26:49+00:00

Currently I’m working alone on a small project for University and I wondered: Does

  • 0

Currently I’m working alone on a small project for University and I wondered: Does it make sense to apply methodologies (XP, Scrum) or parts of it? If only for experience? Or does it produce too much “overhead”? And if it does, which one would fit best?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-13T17:26:49+00:00Added an answer on May 13, 2026 at 5:26 pm

    Methodologies give the approach to tackling a development, to me it would still be applicable if there was one or 100 people on the project. The only difference as you being the sole developer would take on multiple roles within the development.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

Currently i m working on a project where there are users with four roles
Currently I'm working on this page (look at Figure1) I need to make shadow
Currently working on database part of android project. The main aim of the project
Currently, working with Denali RC0 and unable to add BI Time Intelligence to the
Currently, I am modifying a css document to make a website compatible in IE
Currently, Tapping on the same Tab (in which user is working), The App moves
Currently i am working on 1 site, its requirement is that, i have to
Currently, working with RC0 Denali, having some issues I am attempting to review data
currently i am modifying an existing CakePhp project and i'd like to set a
Currently, db4o does not allow indexing on the contents of collections. What object databases

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.