Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 597705
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 13, 20262026-05-13T16:18:33+00:00 2026-05-13T16:18:33+00:00

How do I calculate development time (hours) using COCOMO2? I am trying to calculate

  • 0

How do I calculate development time (hours) using COCOMO2? I am trying to calculate the time (hours) a programmer will spend on a programming project using COCOMO2. Here is what I have so far but I am not sure if this is correct. I would prefer to calculate this by hand, rather than using an online calculator. Any assistance will be really appreciated:

Formula: PM = Coefficient * KLOC ^ (raised to the power of 1.01 + 0.01 * sum of 5 scale factors) * product of 17 cost drivers

Person Months (PM) = ?
Coefficient = 2.5 ?? (mixed experience team, is this coefficient correct?)
Thousand Lines of Code (KLOC) = 100
Sum of 5 Scale Factors = PREC 2.43 + PMAT 2.73 + TEAM 3.95 + FLEX 3.64 + RESL 3.38 = 16.13
Product of 17 scale factors = 17.32

Therefore, 2.5 * 100 ^ (1.01 + 0.01 * 16.13) * 17.32 = 9529.9

Is 9529.9 correct? What unit is it measured in? I am trying to get the hours spent on the project.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-13T16:18:34+00:00Added an answer on May 13, 2026 at 4:18 pm

    From the COCOMO II.2000.0 Model Manual:

    In COCOMO II effort is expressed as
    Person-Months (PM). A person month is
    the amount of time one person spends
    working on the software development
    project for one month.

    That paper is long and describes a lot of different factors. On the wikipedia page
    a form called Intermediate COCOMO is given which has 15 cost drivers, maybe that one is simpler. At http://csse.usc.edu/csse/research/COCOMOII/cocomo_downloads.htm there is a program you can download to calculate (not tested by me).

    Also, estimation of projects can be done online at COCOMO Estimation. There are 3 models being used – COCOMO, COSYSMO & COQUALMO.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

How can I calculate the value of PI using C#? I was thinking it
How do you calculate the least common multiple of multiple numbers? So far I've
I want to calculate the time span between 2 times which I saved in
I have a question in game development. I am building a game for iPhone.
I'm using ASP.NET MVC and Azure Table Storage in the local development fabric. My
I am trying to calculate the correct mouse coordinates, in user coordinate space, in
To calculate a top position for an element of variable height, I was thinking
How do I calculate the distance between two points specified by latitude and longitude?
How do I calculate the CRC32 (Cyclic Redundancy Checksum) of a string in .NET?
How do you calculate the distance between 2 cities?

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.