Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 7090235
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 28, 20262026-05-28T08:01:26+00:00 2026-05-28T08:01:26+00:00

I am running a job timing analysis. I have a pre configured cluster with

  • 0

I am running a job timing analysis. I have a pre configured cluster with 8 nodes. I want to run a given job with 8 nodes, 6 nodes , 4 nodes and 2 nodes respectively and note down the corresponding run times. Is there a way i can do this programatically, i.e by using appropriate settings in the Job configuration in Java code ?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-28T08:01:27+00:00Added an answer on May 28, 2026 at 8:01 am

    There are a couple of ways. Would prefer in the same order.

    1. exclude files can be used to not allow some of the task trackers/data nodes connect to the job tracker/ name node. Check this faq. The properties to be used are mapreduce.jobtracker.hosts.exclude.filename and dfs.hosts.exclude. Note than once the files have been changed, the name node and the job tracker have to be refreshed using the mradmin and dfsadmin commands with the refreshNodes option and it might take some time for the cluster to settle because data blocks have to be moved from the excluded nodes.

    2. Another way is to stop the task tracker on the nodes. Then the map/reduce tasks will not be scheduled on that node. But, the data will still be fetched from all the data nodes. So, the data nodes also need to be stopped. Make sure that the name node gets out of safe mode and the replication factor is also set properly (with 2 data nodes, the replication factor can’t be 3).

    3. A Capacity Scheduler can also be used to limit the usage of a cluster by a particular job. But, when resources are free/idle then the scheduler will allocate resources beyond capacity for better utilization of the cluster. I am not sure if this can be stopped.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I have a long running job that updates 1000's of entity groups. I want
We have a job management application running (Access) with the database in SQL Server
I have a job on SQL Server 2005 running a ssis package. The package
I have a job running under Hudson that has not progressed from Started by
I have a cron job running a PHP script every five minutes; the PHP
I have a long running job. The records to be processed are in a
I have a pretty long running job, which runs for several minutes and then
I have a SQL Server Job running on server X. Now I have to
I have a job object for long running operations that works like this: Class
I am writing Eclipse plugins, and frequently have a situation where a running Job

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.