Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 916055
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 15, 20262026-05-15T17:59:14+00:00 2026-05-15T17:59:14+00:00

I am trying to build a notifier program(email alerts followed by sms alerts in

  • 0

I am trying to build a notifier program(email alerts followed by sms alerts in the future).

However I am unsure how to deal with this scenario and I am unsure if google calendar tries to solve this problem(as they suffer from it as well) or if they just don’t care.

Say User A sets a meeting for 7/20/2010 and shares their calendar with User B then goes to google calendar and adds a reminder of 4 days( so user B should get an email reminder on 7/16/2010).

Now all of a sudden User B changes the meeting to the 7/15/2010 but User B notification does not change. I go and look at it is still set to 4 days(so the reminder I am guessing would be sent on the 16th still).

So do any sites deal with this issue and if so how?

Like if you get dependent on an email alert coming you really could get messed up as they might not be checking the online application as they might go an email alert will tell me when to come.

Some Solutions

  1. User A emails everyone of the change( not a very good option for my site as this is one of my selling points that I want to drive is if you make a change all subscribers will know about the change).

  2. When User A does a change automatically email all subscribers telling them their notification dates might be out of sync. – So So option but I rather have something better.

  3. Try to determine if notification is out of range and try to move it up or down to make it in range. So in the case of my example I would force that subscribers notification to 5 days instead of 4.

This option again is ok but I don’t if I like the though of changing stuff the user did behind their back. Plus this might be hard to figure out how much to move it by or lessen it by.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-15T17:59:14+00:00Added an answer on May 15, 2026 at 5:59 pm

    I don’t see a problem with #3. A reminder request isn’t permanent “user data”, it’s temporary data that has no meaning after a fixed date. If a user requests 4 days notice and the organizer moves the meeting to be 3 days away, then the best way to honor the “request” from the user is to notify them immediately. To not notify them is to fail to honor their request completely.

    To look at it another way, when the meeting is moved such that the request is overdue, you’ve already lost the “user data”. A request has no meaning or relevance after it has has been sent or expired. Your app has failed to honor the user request, simply because you can’t anticipate flakey meeting organizers. I think you can salvage the scraps of the intent behind the request by sending an immediate reminder including a notice that the event has moved.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I am trying build small webcam chat (web application). I searched on google and
Trying to build a plugin effect that will some what look better than this
im trying to build a form+attachment that needs to be send to email. Im
This is my first time playing around with SignalR. I am trying to build
I'm brand new to this and I'm trying build a simple layout of divs.
When trying to build I get this error: $ make CC=i686-w64-mingw32-gcc CC aes.c i686-w64-mingw32-gcc:
I'm trying build a method which returns the shortest path from one node to
I'm trying build an App Engine connected Android application and am having some problems
I'm trying build a MVC framework, but I'm confused about manage themes. Well... I
Trying to build sslsniff on a RHEL 5.2 system here. When compiling sslsniff on

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.