Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 276917
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 12, 20262026-05-12T00:59:33+00:00 2026-05-12T00:59:33+00:00

I am using simulated annealing to solve an NP-complete resource scheduling problem. For each

  • 0

I am using simulated annealing to solve an NP-complete resource scheduling problem. For each candidate ordering of the tasks I compute several different costs (or energy values). Some examples are (though the specifics are probably irrelevant to the question):

  • global_finish_time: The total number of days that the schedule spans.
  • split_cost: The number of days by which each task is delayed due to interruptions by other tasks (this is meant to discourage interruption of a task once it has started).
  • deadline_cost: The sum of the squared number of days by which each missed deadline is overdue.

The traditional acceptance probability function looks like this (in Python):

def acceptance_probability(old_cost, new_cost, temperature):
    if new_cost < old_cost:
        return 1.0
    else:
        return math.exp((old_cost - new_cost) / temperature)

So far I have combined my first two costs into one by simply adding them, so that I can feed the result into acceptance_probability. But what I would really want is for deadline_cost to always take precedence over global_finish_time, and for global_finish_time to take precedence over split_cost.

So my question to Stack Overflow is: how can I design an acceptance probability function that takes multiple energies into account but always considers the first energy to be more important than the second energy, and so on? In other words, I would like to pass in old_cost and new_cost as tuples of several costs and return a sensible value .

Edit: After a few days of experimenting with the proposed solutions I have concluded that the only way that works well enough for me is Mike Dunlavey’s suggestion, even though this creates many other difficulties with cost components that have different units. I am practically forced to compare apples with oranges.

So, I put some effort into “normalizing” the values. First, deadline_cost is a sum of squares, so it grows exponentially while the other components grow linearly. To address this I use the square root to get a similar growth rate. Second, I developed a function that computes a linear combination of the costs, but auto-adjusts the coefficients according to the highest cost component seen so far.

For example, if the tuple of highest costs is (A, B, C) and the input cost vector is (x, y, z), the linear combination is BCx + Cy + z. That way, no matter how high z gets it will never be more important than an x value of 1.

This creates “jaggies” in the cost function as new maximum costs are discovered. For example, if C goes up then BCx and Cy will both be higher for a given (x, y, z) input and so will differences between costs. A higher cost difference means that the acceptance probability will drop, as if the temperature was suddenly lowered an extra step. In practice though this is not a problem because the maximum costs are updated only a few times in the beginning and do not change later. I believe this could even be theoretically proven to converge to a correct result since we know that the cost will converge toward a lower value.

One thing that still has me somewhat confused is what happens when the maximum costs are 1.0 and lower, say 0.5. With a maximum vector of (0.5, 0.5, 0.5) this would give the linear combination 0.5*0.5*x + 0.5*y + z, i.e. the order of precedence is suddenly reversed. I suppose the best way to deal with it is to use the maximum vector to scale all values to given ranges, so that the coefficients can always be the same (say, 100x + 10y + z). But I haven’t tried that yet.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-12T00:59:33+00:00Added an answer on May 12, 2026 at 12:59 am

    mbeckish is right.

    Could you make a linear combination of the different energies, and adjust the coefficients?

    Possibly log-transforming them in and out?

    I’ve done some MCMC using Metropolis-Hastings. In that case I’m defining the (non-normalized) log-likelihood of a particular state (given its priors), and I find that a way to clarify my thinking about what I want.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Ask A Question

Stats

  • Questions 165k
  • Answers 165k
  • Best Answers 0
  • User 1
  • Popular
  • Answers
  • Editorial Team

    How to approach applying for a job at a company ...

    • 7 Answers
  • Editorial Team

    What is a programmer’s life like?

    • 5 Answers
  • Editorial Team

    How to handle personal stress caused by utterly incompetent and ...

    • 5 Answers
  • Editorial Team
    Editorial Team added an answer Categories extend the original class, but they don't subclass it,… May 12, 2026 at 12:54 pm
  • Editorial Team
    Editorial Team added an answer Haven't tested this, but it's something like: RewriteRule \.php$ -… May 12, 2026 at 12:54 pm
  • Editorial Team
    Editorial Team added an answer "0:0:0:0:0:0:0:1" is the IPv6 loopback address as defined in RFC… May 12, 2026 at 12:54 pm

Related Questions

I am putting together a simple simulated network in java, where i can add
I am trying to change the keys my keyboard sends to applications. I've already
My question is pretty straightforward: You are an executable file that outputs Access granted
I'm quickly falling in love with ASP.NET MVC beta, and one of the things

Trending Tags

analytics british company computer developers django employee employer english facebook french google interview javascript language life php programmer programs salary

Top Members

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.