Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 3319356
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 17, 20262026-05-17T22:48:54+00:00 2026-05-17T22:48:54+00:00

I have an TFS server installation that through time has gone through upgrades from

  • 0

I have an TFS server installation that through time has gone through upgrades from TFS 2005 to TFS 2008 and then to TFS 2010.
During the lifetime of the installation a lot of projects have been created and different project templates have been used. MSF Agile 4.0, 4.1, 4.2 and 5.0. and a few MSF CMMI ones.

What I would like to do is “replace” the project template used for all these projects to use a new one common one: Microsoft Visual Studio Scrum 1.0.

I am aware that TFS project templates are used as templates for creating new projects and cannot modify the tfs projects definitions after creation.

Uptil now only the version control and build server part of TFS have been used and there are no existing work item types.

Additionally all projects and build scripts are depending on the source code paths stay the same.

As I see it I have the following options:

Create new TFS projects using the correct project template and then move/branch the source code to the new project.

  1. All code is moved to a temporary team project.
  2. The old project is deleted
  3. New project with the original name and correct process template is created
  4. Code is moved to the new team project
  5. Temporary team project is deleted

    • All the build definitions needs to be to recreated which is not an option.

    • The source code move/branch will “mess up” the versioning history

alt text
By messing up the versioning history I mean that when you move source code it will behind the scenes do a delete + source rename on the original location and the history will still be located in the old project. This will make searching in the history difficult and if I actually delete the old project I will loose all the history before the source code move.

This is really not an option for me since there is years of code change history that is needed to for supporting the different applications being built.

Use the TFS migration tools to migrate to another TFS project

  • This has the same downsides as the first solution

Replace/import work item types, install new reports, create new SharePoint sites

For each tfs project

  • Delete existing work item definitions using “witadmin deletewitd”

  • Import each work item definition from the new process template using “witadmin importwitd”

  • Import work item categories using “witadmin importcategories”

  • Delete old reports in project folder in report server

  • Upload the report definitions from the new process template

  • Modify data sources used for the reports using the report manager to point to the correct shared data sources (TfsReportDS and TfsOlapReportsDS)

  • Modify the report parameter ExplicitProject default value to “” (empty string) and disable prompt user option.

  • Export the documents in the old SharePoint site using stsadm

  • Delete the old SharePoint site

  • Recreate the sharepoint site using the TFS2010 Agile Dashboard site template

  • Activate site feature “Team Foundation Server Scrum dashboard”

  • In TFS Project Settings -> Project Portal Settings: Enable “team project portal” and ensure the url is correct. Enable “reports and dashboards refer to data for this team project”

And finally..

  • Process the Warehouse

  • Process the Analysis Database

Even though that this involves a lot of small steps this looks more appealing because
this option will not force me to move the source code and my existing build definitions will be intact.

My question:

Are there other ways to achieve the replacement of work item types that I haven’t mentioned?

And/or am I missing any steps in last solution?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-17T22:48:54+00:00Added an answer on May 17, 2026 at 10:48 pm

    Given that you aren’t using any existing work item types, your final proposal looks like the best option.

    After deleting the old reports and exporting the SharePoint documents (you could also use Windows Explorer instead of stsadm), there are actually two commands in ‘tfpt‘ that will help you. This will reduce it from 14 steps down to 5 or 6 steps.

    tfpt addprojectreports  Add or overwrite reports for an existing team project
    tfpt addprojectportal   Add or move portal for an existing team project
    
    tfpt addprojectreports /collection:http://yourtfs:8080/tfs/YourCollection /teamproject:"Your Team Project" /processtemplate:"Microsoft Visual Studio Scrum 1.0" /verbose
    tfpt addprojectreports /collection:http://yourtfs:8080/tfs/YourCollection /teamproject:"Your Team Project" /processtemplate:"Microsoft Visual Studio Scrum 1.0" /verbose 
    
    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I have a client that has a SQL Server 2008 installation. They have given
We have TFS installed in a US server. We need to login into VPN
We have TFS 2008 our build set up to checkout all AssemblyInfo.cs files in
I have two domains. TFS 2008 is installed on DEV domain, proxy on PROD.
Setup TFS 2010 on a pretty oldish server (actually an oldish desktop machine running
I have a unique combination of platforms in my solution that has stumped me.
How does Perforce compare to Team Foundation Server (TFS). Here at work, we have
I have installed Team Foundation Server 2010 (basic configuration) on a Windows Server 2003
Underneath one Project in TFS we have multiple products. This is because for us,
My company recently purchased TFS and I have started looking into the code analysis

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.