Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 1057515
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 16, 20262026-05-16T17:52:51+00:00 2026-05-16T17:52:51+00:00

I have installed TFS 2010 using the Scrum for Team System v3. The work

  • 0

I have installed TFS 2010 using the Scrum for Team System v3. The work item templates want you to enter a Project Backlog Item that includes story points, then you need to add linked tasks as a child of the PBI. It is at the task level where you can assign team individuals, update estimated hours left, etc.

What is the importance of the Story Points used at the PBI item if individual tasks are using hours?

Has anyone customized this template so that the child work item tasks use story point burn downs instead of hours? Also, I would be nice to have the total number of story points from each individual task roll up into the PBI item as a read only field for total story points.

Thanks for your time.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-16T17:52:52+00:00Added an answer on May 16, 2026 at 5:52 pm

    We ended up using the TFS Agile template, but just ending up using the “Effort Hours” in the work item tasks and refer to them as story points.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

We have TFS installed in a US server. We need to login into VPN
I have installed and setup RubyCAS-Server and RubyCAS-Client on my machine. Login works perfectly
I have installed CherryPy 3.1.0,. Here is what happens when I try to run
I have installed Delphi Prism and XNA Game Studio 3.0. I have managed to
I have installed Visual Studio 2008 and patch it with SP1. However, I cannot
I have installed Xperf performance analyzer from Windows SDK and captured a trace as
I have installed: Visual C# 2008 Express Visual Web Developer 2008 Express Visual Studio
I have installed pylons based application from egg, so it sits somewhere under /usr/lib/python2.5/site-packages.
I have IIS 5.1 installed on Windows XP Pro SP2. Besides I have installed
I am running a windows machine have installed Python 2.5. I also used the

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.