Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 8662183
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: June 12, 20262026-06-12T16:40:18+00:00 2026-06-12T16:40:18+00:00

I understand that CPU scheduling algorithms are classified into Interactive – Round Robin, Priority

  • 0

I understand that CPU scheduling algorithms are classified into

  1. Interactive – Round Robin, Priority scheduling
  2. Batch Scheduling – FCFS,SJF

But I cant understand the reason behind the naming Interactive and Batch Scheduling..??
Why are algorithms like RR called interactive and those like FCFS called batch scheduling??

Thanks in advance…

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-06-12T16:40:19+00:00Added an answer on June 12, 2026 at 4:40 pm

    The idea of Batch Scheduling is that there will be no change in the schedule during runtime: a process is scheduled to do an operation on data, and it runs until the process is finished. In ‘interactive’ scheduling, a new process could be launched while another process is running, and so time would be allocated for that process as well as the other. In batch scheduling the schedule is determined at the beginning of the operation.

    Example of priority (interactive) scheduling:

    Process A has a high priority, and process B has a low priority. Process A runs until it requires some input from the user. While A is waiting, the CPU gives some time to process B. Once the input for A has been gathered, process B is swapped out and process A is given the CPU, due to its higher priority.

    Example of batch (FCFS) scheduling:

    Process A and process B are processes to be scheduled. Process A is given to the CPU first, so B will not receive any time until A finishes running. Even if A pauses for user input, B will not run (and the CPU time while waiting for input is effectively wasted).

    Of course, as with everything this low-level, it’s not entirely that simple: to gain the illusion of multi-tasking, time is generally divided up between processes even when nothing is waiting for I/O. In priority scheduling, this may mean that more time slices are given to A than B while both are running so that A executes quicker. Both interactive and batch scheduling have their pros and cons: while interactive scheduling gives a quicker response time to the user and divides time up more ‘fairly’, an overhead is incurred due to how long a ‘context switch’ takes, which is the time taken for the processor to switch from working on process A to process B.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I understand that for a CPU-bound task that you typically want 1 thread per
My code often use a lot of system cpu (on ubuntu). I understand that
Programming books sometimes point out that the CPU doesn’t understand the C++ language (or
How do I get CPU temperature and fan speeds in OS X? I understand that
I understand that each CPU/architecture has it's own instruction set, therefore a program(binary) written
I understand that: '\n' // literally the backslash character followed by the character for
I understand that JVM and CLR were designed as stack-based virtual machines. When JIT
I understand that the em measurement is a relative unit for font-size, relative to
I understand that this question may be subjective, this is why I need an
I understand that applications under the same domain name can talk to each other

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.