Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 6252043
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 24, 20262026-05-24T13:43:34+00:00 2026-05-24T13:43:34+00:00

My workplace use MATLAB and sub-products Simulink, Realtime workshop (RTW), RTW Embedded Coder. We

  • 0

My workplace use MATLAB and sub-products Simulink, Realtime workshop (RTW), RTW Embedded Coder. We have a large simulink model that is compiled to C then to an object file for loading onto the embedded target.
The whole compilation process takes ~3h which is quite long, it’s mostly the compilation and linking of the C files produced from the simulink model.

Removing one particular subsystem reduces the compilation time down to 30mins, and since this subsystem doesn’t change very often I plan to code this in C and then into MEX and use the MEX file in the main model.

Will the technique reduce the compilation time?
Is there another technique I should be looking into?

EDIT: I think the solution will be roughly:
Generate C from the offending subsystem
Compile this to some kind of object, library
Include this in the model (but I’m not interested in simulation, it has inputs only)
Include this in the build process, presumably linking after compiling the rest of the code

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-24T13:43:38+00:00Added an answer on May 24, 2026 at 1:43 pm

    You could try to put the offending subsystem into another model and use Model Reference. You can convert a subsystem to a Model block using Simulink.SubSystem.convertToModelReference.

    Model Reference has incremental code generation, so as long as the model doesn’t change, Simulink won’t regenerate or recompile the code for the referenced model.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

At my workplace, we have lab machines that we use to do our testing.
We use a websense internet filter at my workplace. I have an application that
At my workplace we have one large Subversion repository which holds about 100 projects.
At my workplace we use mIRC for realtime communication for those of us who
I have a Matlab script consisting of several cells that should all be able
I have an custom addon developed for our workplace (using the add-on SDK) that
At my workplace, we tend to use iostream , string , vector , map
In your workplace, where do you store your common, non-database specific scripts that you
A problem that we need to solve regularly at my workplace is how to
We have a requirement at my workplace to automate the webservice testing. We have

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.