Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 7948595
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: June 4, 20262026-06-04T01:46:03+00:00 2026-06-04T01:46:03+00:00

Task: For each of our clients, we need to build eight spreadsheets with a

  • 0

Task:
For each of our clients, we need to build eight spreadsheets with a minimum of two triggers each: 1) on Open and 2) Time based to refresh specific data from a larger spreadsheet. (This is a workaround for failing IMPORTRANGE functions.)

We currently have 100 clients, and are expanding to 200 shortly. Therefore, our current need is approximately 800 spreadsheets, and 1,600 triggers; projected to be 1,600 and 3,200 respectively very soon.

Problem
After creating the first 300 spreadsheets (approximately 600 triggers) we have received the following error:

Your Quota of Triggers has been exceeded. To Create more, you must delete some existing triggers.

Desired Solution:
We are collecting the eight spreadsheets on a private Google site for each client. Ideally we could invoke each spreadsheet script from the site, and eliminate time-based triggers. Tried creating a button to execute the script, but on the site, it is not interactive.

Questions:
Operating on Windows 7, error is in Chrome also tried Firefox, and got same error.

1)a Does anyone know of the limits on triggers, is it published somewhere?

1)b Is there a way to increase these limits?

2) Any ideas on another work around or solution?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-06-04T01:46:04+00:00Added an answer on June 4, 2026 at 1:46 am

    Eric already answered your question (1). (No, and no)

    Now to question (2), a possible workaround is to invert the scenario of your scripts, instead of each script fetch its data on the “larger spreadsheet”, a single script on your master could distribute the data on all other spreadsheets. You could have some kind of “registration” of each spreadsheet, maybe place them in the same folder, or any other way that suit you.

    By changing the approach to this one, you’ll surely run into another limitation, which is the script total run time: 6 minutes. But this problem you can easily work around by splitting the task into minor chunks that you can work and resume on a every minute trigger.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

our task is quite simple, we have an object graph where each object (IDItem)
We're using the task within our master build to invoke targets in separate ant
I have an ObservableCollection of Task objects. Each Task has the following properties: AssignedTo
I have an application which performs 30 independent tasks simultaneously using multithreading, each task
This should be an absurdly easy task: I want to take each line of
My task is to simulate activity of couple of persons. Each of them has
I have a task to operate on complex number. Each number consists of double
I have an unordered tree. Each node represents a task that can be done
Task: I have a camera mounted on the end of our assembly line, which
hundreds of our clients around the country have a vb6/MS Access app. The boss

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.