Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 685067
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 14, 20262026-05-14T01:53:05+00:00 2026-05-14T01:53:05+00:00

Team Foundation Server 2008 allows that every check-in is associated with a work item,

  • 0

Team Foundation Server 2008 allows that every check-in is associated with a work item, but what do you do if you are developing some features which span several Team Projects?

For example, you’re developing a specific product for a client and that product has its own Team Project, but is also using some of your other components or tools which are maintained independently in another Team Project.

Where do you create work items for requirements which involve a change in both projects?

  1. Separated, every work item in its own Team Projects
  2. All work items in clients Team Project, regardless of associated source code

The latter seems easier to maintain and control, but it involves associating check-ins from one Team Project to work items in another.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-14T01:53:05+00:00Added an answer on May 14, 2026 at 1:53 am

    For a start I would say that having each check-in associated with a work item is good practice and more important that where exactly that work item lives.

    From the TFS point of view it is really irrelevant whether the work item is in the same project or another – where it makes a real difference is the reporting side.

    Therefore one way of looking at this is to look at reporting. For instance

    • if all work on the project and on the components/tools is charged to the project then it would make sense to create all work items within the project.
    • if changes to the components are funded separately – it would make more sense to create separate work items withing individual projects

    Another way of looking at it is for historical reasons – if you want to be able to go back and see what was changed in a particular tool/component it is easier to see the work items also within the project.

    Probably there is a way to sensibly split the work items and create the work items for the components in the component project and work items for the projects (if they relate to using the component) in the main project. You could always link the two work items together.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

We use Visual Studio 2008/2010 and Team Foundation Server here at work. Sometimes I
We recently installed Team Foundation Server 2008 and we are using it for both
Environment: Team Foundation Server 2005 Visual Studio 2008 I have a reasonably large project
From what I've read, VS 2008 SP1 and Team Foundation Server SP1 packages are
In Team Foundation Server is there a way to have work items in one
Is anyone out there using Team Foundation Server within a team that is geographically
I'm using Team Foundation Server 2008 (SP 1) and I need to move multiple
Consider the use case of: Team Foundation Server (Workgroup edition?) Visual Studio 2008 10-15
We recently moved to Team Foundation Server 2008 from Source Safe. We are setting
I'm currently using Team Foundation Server 2008 as a source control and build engine.

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.