Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 7850545
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: June 2, 20262026-06-02T18:53:31+00:00 2026-06-02T18:53:31+00:00

The workspace in diagram below flows to a stream. I’ve added a build definition

  • 0

The workspace in diagram below flows to a stream.

enter image description here

I’ve added a build definition which builds from this workspace.
If I deliver change sets from a different workspace to the stream in diagram should these change sets be built when I perform a build ? Do the change sets need to be first accepted into the workspace from the stream before they are built ?

Currently when I perform a build the change sets(which have been delivered to the stream from a different workspace)
are not being delivered to the workspace in diagram and so are not being built.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-06-02T18:53:33+00:00Added an answer on June 2, 2026 at 6:53 pm

    If I deliver change sets from a different workspace to the stream in diagram should these change sets be built when I perform a build?
    Do the change sets need to be first accepted into the workspace from the stream before they are built?

    It depends how your build definition is configured:
    As this thread mentions:

    If you are using a build definition that has ‘Jazz Source Control‘ selected as a pre-build participant, you will see in the bottom section of the ‘Jazz Source Control‘ tab the ‘Accept Options section‘.
    The ‘Accept latest changes before loading‘ checkbox should be checked for you to automatically accept changes.

    But with a BuildForge-based Build Definition, as mentioned in “Rational Team Concert 3.0 and Build Forge: An integration scenario“:

    […] Once a Server is selected, as first Step, the Build Forge project loads an Adaptor (JazzJBE.xml) to facilitate the integration between Build Forge and RTC.
    This adaptor runs the Jazz Build Engine, which is part of the buildtoolkit, to accept and fetch source code based on the properties passed on by the RTC Build Definition
    (A more typical continuous integration scenario with RTC would have the Jazz Build Engine running in the background on the build Server, listening for requests. With the JazzJBE adaptor, the Jazz Build Engine is launched on demand).

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I have sloccount.sc in my workspace which was generated during the build process and
I have a MS-Visual Studio 2005 workspace having all c code. This application(exe) allocates
I want to build a workspace with subversion, and I followed some tutorials; Install
The p4v Perforce GUI client has an 'Actions > Remove from Workspace' menu command
What do I have to do to copy a complete workspace from one computer
I have a workspace with a project which links with the static libraries in
When Eclipse builds my workspace, I assume that it creates Java .class files. What
Someone added a workspace incorrectly, so after I fixed it TFS thought I had
I can't find anything workspace related in the Xcode Build Setting Reference . Essentially
I have an eclipse workspace with a bunch of projects from git, I am

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.