Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 601715
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 13, 20262026-05-13T16:44:43+00:00 2026-05-13T16:44:43+00:00

We are currently using TFS 2008 with the Scrum for Team System template from

  • 0

We are currently using TFS 2008 with the Scrum for Team System template from Conchango, with a few minor tweaks. We are looking at upgrading to TFS 2010 and we are considering moving to the MSF for Agile template.

What is the best way to move to a new process template and keep history? I’d like to be able to create a new team project on the TFS 2010 server, get everything checked-in, and move our source to the new project. It would be nice if we could somehow keep the check-in comment history and possibly even be able to navigate back to the work item history associated with a changeset in the old project. I’d even be willing to migrate the old project as-is over to 2010 and then move the source to a new project, retaining the old project with work items only in 2010.

Has anyone gone through the process that can over some advice?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-13T16:44:44+00:00Added an answer on May 13, 2026 at 4:44 pm

    We are in a simalar situation that you are (right down to the templates we are on versus the one we want to be on), although we only have source code in our existing Team Foundation Server instance. We are planning to do a migration from Team Foundation Server 2008 to Team Foundation Server 2010, as opposed to an upgrade. Although we have not done so yet, you do have the have two options you have outlined.

    Like you mention, you can migrate the source code and Work Item Tracking to a new Team Project using this tool. It will “compress” the history dates, as TFS will want to add its own timestamp. There will be some potential history issues, from what I understand. Specifically, in TFS 2010, you might have issues comparing versions from the pre-migrated source control. At least, so far, I have in my experiments in our test lab. My understanding of this issue is that it relates to item-mode vs. slotted-mode as the defaults between the two versions. I can look at individual versions and can see history – so that meets our requirements.

    The other option is source control in one project and work items in another. I have not tried this, because I would imagine that the changeset relationships would be broken on existing work items and would not be generated going forward. This may or may not a be a big deal to you.

    Also, it might be a good idea to describe your situation in the discussion area of the project on Codeplex. The authors are on the TFS Migration Team at Microsoft and depend on feedback of people in the same boat we are. I have been exchanging a couple of emails with them so far, and they have been quite helpful.

    Based upon our discussions with the very helpful folks at Microsoft, we are likely going to backup the databases and follow the directions on Bryan Krieger’s blog post (Path 2: Migration Upgrade). I am hoping to make a test run at the upgrade using an older backup as early as next week.

    Best of luck! I know it is intimidating. Luckily, my installation and configuration experiences with a fresh TFS 2010 install in the lab have been much more smooth than my initial exposure to the TFS 2008 process. Hopefully, you find the same is true.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.