Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 6819529
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 26, 20262026-05-26T21:19:02+00:00 2026-05-26T21:19:02+00:00

We are using TFS2010 for source control, the source repository has 3 main branches;

  • 0

We are using TFS2010 for source control, the source repository has 3 main branches; MAIN, REL and DEV

Consider this scenario:
Several developers are working in the REL branch (fixing shipping issues). As they work their changes are checked into the REL branch tested and subsiquently merged back into the MAIN branch.

When developers perform their merge (using the source code explorer in VS2010) if they pick the “selected changesets” option the dialog performs some sort of query and presents them with a list of candidate changesets that exist in the source (REL) branch that have not yet been merged into the target (MAIN) branch.

Given that there may be a delay between the DEV commit and the subsiquent merge we are finding people “forgetting” some changesets.

What I would like to do is create a work item query or Excel report that can reproduce the dialogs query results so we can add this to the projects SharePoint portal.

Specifically: given the current user, and a source and target branch name can I use WIQL or a Excel document to retrieve a list of changesets not currently merged into the target branch.

Can anyone tell if this is possible? and better still tell me how to do it!

The question TFS: List changesets that have not been merged asks a similar question but the aswer alludes to a “write your own code” solution, I would like to pull this off with the “out of the bag” tools; Excel or WIQL.

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-26T21:19:03+00:00Added an answer on May 26, 2026 at 9:19 pm

    Take a look @ this answer

    How can I check which branches a TFS 2008 changeset has been merged into?

    They outline the tf merge command to list the changesets that need to be merged.

    When I had to do something like this I ran a command similar to the one in the answer above and fed it into a text file, with a little bit of tweaking, you could probably turn it into a .csv then open it in excel and filter it by user etc.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

My team has been using Visual SVN for source code control, and we plan
I have just started using TFS2010 as a source control, moving away from VSS.
we've recently started using TFS2010 for source control. It's working well with the first
We are using internally TFS 2010 as source control repository for our .NET Projects.
I'm using TFS 2010 for source control and for continuous integration (among other things).
Today we are using TFS 2008 for source control, and I imagine we will
I'm using TFS 2010 as a Source Control System and have the problem that
Initially we didn’t use any source control software. Now we are using TFS 2010
I'm working on a utility processing files being under source control using TFS 2010.
Using online interfaces to a version control system is a nice way to have

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.