Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 180961
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 11, 20262026-05-11T14:40:40+00:00 2026-05-11T14:40:40+00:00

We have decided to go with a virtualization solution for a few of our

  • 0

We have decided to go with a virtualization solution for a few of our development servers. I have an idea of what the hardware specs would be like if we bought separate physical servers, but I have no idea how to consolidate that information into the specification for a generalized virtual server.

I know intuitively that the specs are not additive – I shouldn’t just add up all the RAM requirements from each machine to get the RAM required for the virtual server. I can’t really treat them as parallel systems either because no matter how good the virtualization software is, it can’t abstract away two servers trying to peg the CPU at the same time.

So my question is – is there a standard method to estimating the hardware requirements for a virtualized system given hardware requirement estimations for the underlying virtual machines? Is there a +C constant for VMWare/MS Virtual Server overhead (and if so, what is C?)?

P.S. I promise to move this over to serverfault once it goes into beta (Promise kept)

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. 2026-05-11T14:40:41+00:00Added an answer on May 11, 2026 at 2:40 pm

    Yes add 25% additional resources to manage the VM. So if I need 4 servers that are equal to single core 2 ghz machines with 2 gigs of ram I will need 10 ghz processing power plus 10 gigs of ram. This will allow all systems to redline and still be ok.

    In the real world this will never happen though, all your servers will not always be running all the time. You can get a feel for usage by profiling your current servers and determine their exact requirements and then adding an additional 25% in resources.

    Check out this software for profiling utilization http://confluence.atlassian.com/display/JIRA/Profiling+Memory+and+CPU+usage+with+YourKit

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I have a largish Mercurial repository that I've decided would be better as several
I have decided that all my WPF pages need to register a routed event.
I have decided that I really need to get some flowcharts for reverse engineering
I have decided to take up f# as my functional language. My problem: Give
I've been developing a site using ASP.NET MVC, and have decided to use the
Hey peoples, I've been studying Java for a couple of weeks, and have decided
I have some commits that I've decided, after the fact, are going to be
I've recently decided that I just have to finally learn C/C++, and there is
I decided to teach myself assembly language. I have realized that my program will
I decided to learn C++ (I program in C at work), and I have

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.