Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • Home
  • SEARCH
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 6864503
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 27, 20262026-05-27T02:55:11+00:00 2026-05-27T02:55:11+00:00

We have two TFS build servers (build controllers) available for our application. Builds are

  • 0

We have two TFS build servers (build controllers) available for our application. Builds are triggered as configured in the build definition. Every build is configured via “Build Defaults” page to specific build controller.

Let’s say we have a gated check-in build. Build time is 30 minutes, 3 check-ins are made per hour. Normally these 3 gated check-in builds are triggered on the build controller 1, other build controller2 is idle.

How to trigger gated check-in build on the build controller2 if build controller1 is in use?

Is it possible to queue build on the build server with shortest build queue?
How to configure load balancing on build controllers?

EDIT:
I found possible solution for TFS2008 here. I’m looking for solution working for TFS2010

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-27T02:55:11+00:00Added an answer on May 27, 2026 at 2:55 am

    I don’t think this is possible. A controller can balance a build out onto which ever agents are available and that match the agent pattern of the the build (as defined in the build definition). Unless you have a serious load of build’s, I would stick with a single controller per collection and more agents.
    The controller does very little work compared to and agent (which does the compilation, testing and deployment).

    TFS Topology

    For your cases I would try something like:

    Controller

    • Gated Agent 1 (on \\sv-BuildAgent1)
    • Gated Agent 2 (on \\sv-BuildAgent2)
    • QA Agent… (on \\sv-BuildAgent3)
    • Other agents… (on \\wherever)
    • …etc…

    Now each of the Gated Build’s Definition you would set the Build Agent to “Gated Agent *” (It’s under the Process tab in 3. Advanced -> Agent Settings -> Name Filter.). This will now pick any agent that starts with “Gated Agent”. You can easily scale this to as many agents on as many boxes as you need.

    EDIT:

    You can also put Tags on Build Agent to a achieve a similar result. This may be easier to configure. You Define the Tags in the Build Agent’s properties and Configure Definitions to use them in the same section as the Name Filter (above).

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

We have a build definition in TFS 2008 that builds one of our solutions
We are using TFS Build 2010 for Builds. We have two branches of source
I have two servers with TFS installed, one that runs the build service, and
We have TFS 2008 our build set up to checkout all AssemblyInfo.cs files in
Using VS2008 TFS I have created a setup application that installs two Window Services.
I have two build processes setup in TFS 2010. One build starts when any
Scenario I have a C# application compiled as a DLL. I have a build
I have two TFS branches that do not have a direct parent/child relationship in
We have a TFS 2008 project with two branches (Main and NewFeature). Each is
I have two Visual Studio database projects. Both build fine on my local dev

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.