Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 7737579
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: June 1, 20262026-06-01T08:02:28+00:00 2026-06-01T08:02:28+00:00

We use TFS 2010 continuous integration automated builds that get kicked off on every

  • 0

We use TFS 2010 continuous integration automated builds that get kicked off on every check-in. I recently changed the process template to build Debug and Release in parallel on different build agents as opposed to sequentially on the same agent.

Ever since then, we are itermittently seeing a build failure due to the following error. It happens frequently enough that it is unacceptable (every 5th-10th build or so).

“TF203059: The label already exists. Retry the command with a different label name”

I haven’t been able to figure out a specific pattern that causes this to happen. Has anyone come across this before? Is there a change that should be made to the Create Label activity in the build process?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-06-01T08:02:29+00:00Added an answer on June 1, 2026 at 8:02 am

    There are a couple of issues that can come from parallelization. The labels is one, and modifying work items is the second. There may be more, but that’s what I’ve run into. If you move both into the single threaded part, it should fix your problems. However, that often comes with its own host of problems. IIRC, labeling requires you to map the workspace and get latest before you can label, so if you have a lot of files, this can mitigate any performance benefits of parallelizing. For the work items, the problem can occur because one process modifies the work item after another branch reads it, and TFS pitches a fit that it’s changed so it cannot update.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

I'm looking for a TFS 2010 GUI client that I can use outside of
We have a WPF application and we are using TFS 2010 for continuous integration.
I have implemented Continuous Integration using TFS Version Control and TFS Build 2010. The
I have Visual studio 2010 that work with TFS 2008. How Do I Use
I'm using TFS 2010 for source control and for continuous integration (among other things).
I am using TFS 2010. Currently I use Gated Check-in build on the trunk
After a long investigation on how to use TFS 2010 I started with the
My company is a Software development company. We planned to use TFS 2010 for
Can I use TFS Client 2010 with TFS server 2008? Or it is not
I've created a new Work Item type for use in our TFS 2010 setup

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.