Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 7704667
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 31, 20262026-05-31T23:43:57+00:00 2026-05-31T23:43:57+00:00

I want to measure time memory allocation using this code: long AForMemory = DateTime.Now.Ticks;

  • 0

I want to measure time memory allocation using this code:

long AForMemory = DateTime.Now.Ticks;
double[] massDoubleForMemory = new double[num];
long BForMemory = DateTime.Now.Ticks;
long rezult = BForMemory - AForMemory;

But, no matter how much is num(100k or 1M), rezult = 0 or 10001 (randomly). Why? Or is it correct way to measure?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-31T23:43:58+00:00Added an answer on May 31, 2026 at 11:43 pm

    DateTime is not precise enough to meassure such small time gaps. You can use a stopwatch for that from the System.Diagnostics namespace

    int num = 1024 * 1024;
    Stopwatch sw = new Stopwatch();
    sw.Start();
    long AForMemory = DateTime.Now.Ticks;
    double[] massDoubleForMemory = new double[num];
    sw.Stop();
    long elapsed = sw.ElapsedTicks;
    

    If your attempt is to diagnose the impact that certain types of allocations have, then you’re very likely looking at the wrong place. Allocation in .NET can be very fast or very slow. If an allocation is preceded by a garbage collection for example or a new memory block needs to be reserved by the garbage collector to satisfy your request, the request itself might take a long time compared to when the gc collector has enough space available. The GC is dynamic in a way that it can determine anytime to do some heavy operations.

    Apart from that, the real performance problems come with garbage collections, not allocations.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

What I want is to measure time with milliseconds, but using Chronometer has the
I want to measure the execution time (using I guess duration from SQL Server
Suppose I want to measure the time that a certain piece of code takes.
I want to be able to measure the time it take to execute an
I am forking a number of processes and I want to measure how long
I have a normal asp.net page containing some code that I want to measure
Say I have a method Foo() and I want to measure the time in
I want to measure the execution time of for loops on various platforms like
I want to measure how long an RTT is to the server... Here is
I'm using ASM java byte code instrumentation and my goal is to measure the

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.