Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people’s questions, and connect with other people.

Have an account? Sign In

Have an account? Sign In Now

Sign In

Login to our social questions & Answers Engine to ask questions answer people’s questions & connect with other people.

Sign Up Here

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

The Archive Base

The Archive Base Logo The Archive Base Logo

The Archive Base Navigation

  • SEARCH
  • Home
  • About Us
  • Blog
  • Contact Us
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Add group
  • Groups page
  • Feed
  • User Profile
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Buy Points
  • Users
  • Help
  • Buy Theme
  • SEARCH
Home/ Questions/Q 221261
In Process

The Archive Base Latest Questions

Editorial Team
  • 0
Editorial Team
Asked: May 11, 20262026-05-11T19:01:00+00:00 2026-05-11T19:01:00+00:00

I work with scrum about 2 months and don’t have all the experience I

  • 0

I work with scrum about 2 months and don’t have all the experience I wish, so I would like to hear some inputs about it.

My concern is people never say about drawbacks for the two sides; company and workers.
I know the benefits of a cross-functional team but which are the drawbacks? What is hidden beside the amazing Eden Garden?

I’m confused because as a company benefits of replaceable people, for the team is good because the opportunity of having knowledge and share experience (besides all teamwork benefit).

Again, I know all the benefits but I want explore the drawbacks just because in the middle there are the ordinary people.
Normally these people dedicate heavily to gain knowledge. They buy books, courses, attending seminar and so on.

In every company when someone knows much more than everyone else, people and managers get desperate wishing or even demanding that these ordinary people share all their knowledge.

And that’s strange.. Because these are communism thoughts and we live in capitalism society and since I was born, everything was so competed and now people say about collaborative.

Can Scrum and Lean principles ruins (or making hard) the professionals’ life?

  • 1 1 Answer
  • 0 Views
  • 0 Followers
  • 0
Share
  • Facebook
  • Report

Leave an answer
Cancel reply

You must login to add an answer.

Forgot Password?

Need An Account, Sign Up Here

1 Answer

  • Voted
  • Oldest
  • Recent
  • Random
  1. Editorial Team
    Editorial Team
    2026-05-11T19:01:01+00:00Added an answer on May 11, 2026 at 7:01 pm

    Scrum and Lean, in and of themselves, cannot ruin anybody’s life. Nor can they, alone, make your life.

    The culture of your organization will always be a far more dominant factor than the particular product management or development management method in place. Scrum can be misused. Lean can indeed make workers feel replaceable and pressured to perform all day, all the time.

    On the other hand, both tools (they are just tools) can be used to create high-performing teams where all members value each other and each others’ contributions. Being on a team that delivers consistently good results at high velocity feels great.

    You will also find every result in between. It depends much more on culture than process.

    I believe that culture flows from the top. Therefore, look at how the company leaders treat each other, their subordinates, their vendors, and their customers. That will tell you much more about what your life will be like than which methodology the company follows.

    • 0
    • Reply
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
      • Report

Sidebar

Related Questions

Work on asp.net vs05. I have three type of value Like:IsDesign,IsPrinting,IsInstall they are bit
We have been using Scrum for around 9 months and it has largely been
I have an issue at work where we have just started using scrum as
I have installed TFS 2010 using the Scrum for Team System v3. The work
Work on this small test application to learn threading/locking. I have the following code,
Work on the following website: http://cetcolor.com The masthead graphic with the Read About It
I work on code something like this ... HEADERS ... int *var; void child()
At work, we have migrated from Windows XP to Windows Vista. After the migration,
I'm going to do Scrum in VSTS (TFS 2010). I know about the famous
I downloaded and installed the new Team Foundation Server Scrum v1.0 beta work template

Explore

  • Home
  • Add group
  • Groups page
  • Communities
  • Questions
    • New Questions
    • Trending Questions
    • Must read Questions
    • Hot Questions
  • Polls
  • Tags
  • Badges
  • Users
  • Help
  • SEARCH

Footer

© 2021 The Archive Base. All Rights Reserved
With Love by The Archive Base

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.